Florence Regional Airport (FLO) has installed South Carolina’s first electric aircraft charger through a partnership with BETA Technologies.
The new charging infrastructure supports electric aircraft and ground vehicles, positioning FLO to expand its operations for the future.
The infrastructure includes Level 3 fast charger on the airside for electric aircraft and support vehicles, as well as a two-port Level 2 charger in the parking lot for public use.
BETA Technologies' charging infrastructure, along with the development of electric aircraft, aims to drive the growth of electric aviation and sustainable transportation.