menu
techminis

A naukri.com initiative

google-web-stories
Home

>

Startup News

>

India's 1s...
source image

Startup Pedia

5d

read

318

img
dot

Image Credit: Startup Pedia

India's 1st bullet train production to start at BEML’s Bengaluru plant, 280 kmph trainset to roll out on MAHSR corridor by 2026

  • BEML, a Bengaluru-based state-owned defence PSU, will manufacture India’s first bullet train at its facility, starting with the prototype in September 2025.
  • The first bullet train is expected to be rolled out for testing on the Mumbai-Ahmedabad High-Speed Rail corridor by December 2026.
  • The trainsets will reach speeds of up to 280 kmph, designed with domestically sourced products and components to keep costs lower than competitors.
  • Japan International Cooperation Agency (JICA) is financing a majority of the MAHSR project, with the first bullet train prototypes set to undergo testing in early 2026.

Read Full Article

like

19 Likes

For uninterrupted reading, download the app