<ul data-eligibleForWebStory="false">KLIA aerotrain suspended for an hour due to heavy rain causing water build-up in the tunnel.Malaysia Airports Holdings Bhd (MAHB) stated that a technical fault in a drainage pump stopped automatic water removal.Train operations were halted until water was manually cleared for safety reasons.Service resumed after clearance from technical and safety teams; pump system being rectified for future adverse weather performance.