Mumbai-specific 'Kavach Version-5' train protection system is expected to be completed by December-end.The system will allow the introduction of 30% more trains on the suburban network.To reduce the heavy crush load, the new trains will be redesigned to improve oxygen and air flow, as well as door closure timing.The Railway Minister has committed a significant investment of Rs 17,000 crore for projects in Mumbai.