menu
techminis

A naukri.com initiative

google-web-stories
Home

>

Databases

>

Crusoe $3....
source image

Siliconangle

4w

read

1.6k

img
dot

Image Credit: Siliconangle

Crusoe $3.4B joint venture to build AI data center campus with up to 100,000 GPUs

  • Crusoe Energy Systems LLC, Blue Owl Capital Inc. and Primary Digital Infrastructure are launching a $3.4 billion joint venture to build a data center campus in Texas.
  • The campus will comprise two facilities in Abilene, Texas, offering 998,000 square feet of floor space and 205 megawatts of power.
  • The data center will be powered by off-site renewable energy sources and will have capacity for up to 100,000 GPUs.
  • Crusoe has already signed a long-term lease with an undisclosed Fortune 100 hyperscale tenant, believed to be Oracle, to host AI workloads for OpenAI.

Read Full Article

like

27 Likes

For uninterrupted reading, download the app